top of page
Benicia Martinez Banner.jpg

Benicia-Martinez Bridge (I-680) - Congressman George Miller Bridge

Carquinez Strait, California

Project Description

The Benicia Martinez Bridge is 1.7 miles long, carrying five lanes of traffic. It is a post-tensioned reinforced concrete box girder constructed with cast in place balanced cantilevers.

 

Because I-680 is classified as a lifeline route, Caltrans designated the new Benicia-Martinez Bridge a "lifeline" structure. The bridge was designed so the main-span structure would withstand a functional level earthquake with minimal damage and an immediate service level. For a safety level earthquake, the structure was designed for an immediate service level for vehicles shortly after a major earthquake with minimal repairable damage. The bridge also features the Bay Area's first open-road tolling, toll-booth-free lanes for FasTrak users, intended to alleviate traffic congestion problems, especially during commute times.

 

The bridge was completed in August of 2007 at a cost of US$1.3 billion.

Aspire Bridge Magazine Article: When Lighter is Better

__________________________________________________________________

 

Our Role

Jason Hatcher was employed as a Lead Senior Draftsman by Parsons from September 2001 - June 2007. During that time, Jason was the lead draftsman for the Benicia Martinez Bridge.

 

Using light weight concrete, the bridge superstructure was heavily congested with reinforcing steel and post tensioning hardware. A site based team with representatives for the owner, designer, constructor and construction engineer was set up to quickly and efficient resolve congestion and constructability difficulties.

Based on site, Jason led a site based team of drafters and engineers and represented the construction engineer in daily meetings to resolve construction issues as they were identified. Jason also led the project drafting team for the construction engineer and was personally responsible for the integrated shop drawings for the complex hinge segments (5 hinges total) and several pier tables, as well as overseeing all shop drawing production.

Location

 

Carquinez Strait, California

Benicia, California - Martinez, California

Owner

 

Caltrans

Contractor

Kiewit

 

Designer

 

TYLin / CH2M-Hill (Joint venture)

Caltrans (northern approach spans)

Construction Engineer

Parsons

Total Contract Value

$1.3 Billion

Timeline

 

2001 - 2007

Construction Methods

Cast-in-place segmental superstructure using form travelers to construct using the balanced cantilever method

bottom of page