top of page
Carmel Banner 2.jpg

Carmel Tunnel Bridges (Rupin Interchange Bridges)

Haifa, Israel

Project Description

The Carmel Tunnel project will alleviate traffic congestion in central Haifa by allowing vehicles to bypass the central part of the city. The $300 million project consists of two 5-km long tunnels through Mount Carmel, 5 conventional bridges, 6 segmental bridges, and 11 kilometers of roads which will link the tunnels to Israel's highway system.

__________________________________________________________________

 

Our Role

Hatcher Technical worked with co-designer and construction engineer McNary Bergeron & Johannesen to develop construction shop drawings.

Areas of the project that Hatcher Technical worked on included:

  • Precast superstructure segments

Location

Haifa, Israel

Owner

 

Build-Operate-Transfer (BOT) project

financed by Carmelton Group, Ltd.

Contractor

Ashtrom Engineering & Construction /

Solel Boneh Ltd. (Joint Venture)

Designer

ZZZ Engineering

McNary Bergeron & Associates

Total Contract Value

$300 million

Timeline

2006 - 2010

Construction Method

  • Precast segmental (three bridges)

    • Cast-in-place concrete piers

    • Balanced cantilever using ground based cranes

    • 154 total precast segments

  • Cast-in-place segmental (three bridges)

    • Balanced cantilever using form travellers

    • 151 total cast-in-place segments