Sarah Mildred Long Bridge
Portsmouth, New Hampshire - Kittery, Maine
Project Description
The original Sarah Mildred Long Bridge, built in 1940, provided a regional link between Maine and New Hampshire, and was the critical backup route in case of disruption on the Interstate 95 bridge.
The new bridge alignment improves marine navigation by straightening the navigational channel, allowing larger ships to access the port and shipyard. With a larger 56' vertical clearance in its "resting" position, there are 68% fewer bridge openings. In the normal operating, "resting" position, the bridge's lift span is at its middle level, allowing motor vehicles to cross the river. The new bridge's movable "hybrid" span lifts up to allow passage of tall vessels and lowers to railroad track level for trains to cross. 200' tall precast concrete towers support the 300' long streamlined structural steel box girder lift span. The new bridge layout uses eleven (11) fewer piers than the original bridge.
Aspire Bridge Magazine Article: Sarah Mildred Long Bridge
Awards
American Segmental Bridge Institute (ASBI) 2019 Bridge Award of Excellence
__________________________________________________________________
Our Role
Working with construction engineer, McNary Bergeron & Associates, Hatcher Technical produced construction shop drawings for the full bridge, both substructure and superstructure. This included;
-
Fully integrated shop drawings for the main span tower foundations.
-
Fully integrated shop drawings for the 4 main span lift towers (88 total segments)
-
Fully integrated conflict free 3D models of the cast-in-place tower caps
-
Fully integrated shop drawings of the cast-in-place tower caps
-
Fully integrated shop drawings for the precast segmental vehicle bridge superstructure (239 total segments)
-
Fully integrated shop drawings for the precast segmental railroad bridge superstructure (139 total segments)
-
Fully integrated conflict free 3D models of selected tower, vehicle and rail bridge segments
Location
US Route 1A (Bypass) over Piscataqua River
Portsmouth, New Hampshire to
Kittery, Maine
Owner
Maine Department of Transportation, and
New Hampshire Department of Transportation
Contractor
Cianbro
Designer
Figg / Hardesty & Hanover (Joint Venture)
Construction Engineer
McNary Bergeron & Associates
Total Contract Value
$164 Million
Timeline
2015 - 2017
Construction Method
-
Two-level precast segmental approaches crane erected from barges and trestle
-
Integral shared piers
-
Precast cofferdam tub footings
-
Four precast segmental mainspan liftspan towers