Mekolot Bridge
Haifa, Israel
Project Description
​
This five span, 200m long bridge, in conjunction with the Kishon-Yadin bridges and Carmel Tunnels Project, is part of an improvement plan for the transportation corridor through Haifa's downtown and port area. The bridge is precast segmental and constructed with ground based cranes in balanced cantilever.
__________________________________________________________________
Our Role
​
Hatcher Technical worked with construction engineer McNary Bergeron & Johannesen to develop construction shop drawings.
​
Areas of the project that Hatcher Technical worked on included:
-
Precast superstructure segments
Location
​
Haifa, Israel
​
Owner
Israel
​
Contractor
​
Solel Boneh
​
Designer
​
Pakatz
Total Contract Value
​
$3 million
​
Timeline
​
2007
​
Construction Method
​
-
Precast segmental
-
Balanced cantilever using ground based cranes