Yadin Bridges
Haifa, Israel
Project Description
This five span, 200m long bridge, in conjunction with the Kishon-Yadin bridges and Carmel Tunnels Project, is part of an improvement plan for the transportation corridor through Haifa's downtown and port area. The bridge is precast segmental and constructed with ground based cranes in balanced cantilever.
__________________________________________________________________
Our Role
Hatcher Technical worked with co-designer and construction engineer McNary Bergeron & Johannesen to develop construction shop drawings.
Areas of the project that Hatcher Technical worked on included:
-
Precast superstructure segments
Location
Haifa, Israel
Owner
Israel National Roads Company, Ltd.
Contractor
Solel Boneh
Designer
ZZZ Engineering
McNary Bergeron & Associates
Total Contract Value
$30 million
Timeline
2006 - 2009
Construction Method
-
Precast segmental
-
Balanced cantilever using an overhead launching gantry
-
Adjacent girders connected using a cast-in-place closure strip